Concrete Calculator

Enter your slab dimensions to find out how much concrete you need — in cubic yards for ready-mix, or in bags for DIY.

LENGTH WIDTH THICKNESS

Runs entirely in your browser — your numbers never leave this page.

How it works

Concrete is sold two ways: by the cubic yard (ready-mix truck) or by the bag (DIY from the hardware store). This calculator does the volume math for you:

Volume (cu ft) = Length (ft) × Width (ft) × Thickness (ft)

Cubic yards = Volume ÷ 27

Frequently asked questions

How many 80-lb bags of concrete are in a cubic yard?

About 45. One 80-lb bag yields roughly 0.6 cubic feet, and a cubic yard is 27 cubic feet (27 ÷ 0.6 = 45).

Should I buy bags or order ready-mix?

For small jobs under about 2 cubic yards, bags are fine. For anything bigger, a ready-mix truck is usually cheaper per yard and saves enormous labor.

How thick should a concrete driveway be?

6 inches is the standard for residential driveways that carry cars. Walkways and patios are fine at 4 inches.

Why add 10% extra?

Forms are never perfectly true, subgrades vary, and some concrete always sticks to the mixer or wheelbarrow. Running short mid-pour creates a weak cold joint.

How do I measure an irregular shape?

Break it into rectangles, calculate each one, and add them up. For circles, use π × radius² × thickness.

80-lb vs 60-lb bags — which should I buy?

80-lb bags give you more concrete per bag and fewer bags to haul, but each one is heavy. 60-lb bags are easier on your back for small repairs.

How much area does one cubic yard of concrete cover?

One cubic yard covers about 81 square feet at 4 inches thick, or about 54 square feet at 6 inches thick. So a 10×12 ft patio at 4 inches needs roughly 1.5 cubic yards.

Can I pour a slab in sections on different days?

You can, but each joint between pours is a cold joint — a weak plane where cracks love to start. For structural slabs, pour in one go. For large patios, plan deliberate control joints instead of accidental ones.

How long before I can walk or drive on new concrete?

Walk on it after 24–48 hours, drive on it after about 7 days. Concrete keeps curing for 28 days to reach full strength — keep it damp for the first week in hot weather.

What is a "short load" fee?

Ready-mix companies often charge extra for orders under 3–4 cubic yards, since the truck still makes the trip. Always ask about the short-load fee when comparing bags vs. ready-mix for small pours.