Kitchen Remodel Cost Estimator
Enter your kitchen size and the finish level you want for a realistic cost breakdown — cabinets to countertops.
Runs entirely in your browser — your numbers never leave this page.
How it works
Kitchen remodels are priced per square foot by finish tier — the industry's standard estimating method:
- Budget refresh (~$125/sq ft): paint cabinets, new counters, stock fixtures — same boxes, new skin.
- Mid-range (~$275/sq ft): semi-custom cabinets, stone counters, new appliances — the most common remodel.
- High-end (~$500/sq ft): custom cabinetry, pro appliances, structural touches.
- Cabinets are king: ~30% of the budget. Refacing instead of replacing can halve this line.
- Layout changes (moving plumbing, gas, or walls) add ~25% — the single biggest cost lever you control.
- ROI: mid-range remodels recoup ~60-70% at resale; high-end recoups less. Remodel for yourself, not the next buyer.
Frequently asked questions
How much does a kitchen remodel cost?
Roughly $125/sq ft (budget refresh), $275/sq ft (mid-range), or $500/sq ft (high-end). A 150 sq ft mid-range kitchen ≈ $41,000.
What is the most expensive part?
Cabinets — about 30% of the budget. Refacing existing boxes instead of replacing them is the biggest single saving.
How can I cut remodel costs?
Keep the layout (saves ~25%), reface cabinets, choose mid-range appliances, and do demo/paint yourself.
How long does a kitchen remodel take?
Budget refresh: 2–4 weeks. Mid-range: 6–10 weeks. High-end with layout changes: 3–5 months.
What ROI does a remodel give?
Mid-range remodels recoup roughly 60–70% at resale. High-end remodels recoup less — remodel for your own use first.
Should I move the plumbing?
Only if the layout truly doesn't work — moving plumbing and walls adds ~25% to the project. Designers earn their fee here.
How much contingency should I budget?
15% minimum. Old kitchens hide water damage, bad wiring, and unlevel floors — the contingency always gets used.
Quartz vs granite countertops?
Quartz: consistent, low maintenance, mid-price. Granite: natural stone, needs sealing, similar price. Both beat laminate on durability.
When should I buy appliances?
During holiday sales (Black Friday, Labor Day) — and order early; lead times of 8–12 weeks are still common.
Do I need a permit?
Usually yes for electrical, plumbing, or structural changes. Cosmetic-only refreshes often don't. Check your city — unpermitted work hurts resale.