Sod Calculator

Enter your lawn size to find out how much sod to order — in rolls for small patches or pallets for full lawns.

LENGTH WIDTH

Runs entirely in your browser — your numbers never leave this page.

How it works

Sod is sold by the roll (2×5 ft = 10 sq ft) or the pallet (~450 sq ft, about 50 rolls). The math:

Order area = Lawn area × (1 + Waste)

Frequently asked questions

How much sod do I need?

Measure area, add waste (5–15%), divide by 450 for pallets or 10 for rolls. A 40×30 ft lawn is 1,200 sq ft → ~1,320 with waste → 3 pallets (or 132 rolls).

How big is a roll / pallet of sod?

A standard roll is 2×5 ft (10 sq ft). A pallet holds ~50 rolls ≈ 450–500 sq ft and weighs over a ton — have it forklifted to the work area.

How much does sod cost?

Roughly $0.30–0.80 per sq ft for the sod itself (varies by grass and region), plus delivery ($50–150). Installation doubles it if hired out.

Can sod be laid over existing grass?

Bad idea — the old grass rots underneath, creating a spongy layer the sod never roots through. Strip or till the old lawn first.

How soon can I walk on new sod?

Lightly after 2 weeks; normally after 3–4 weeks once roots grab (test with a gentle tug). Keep traffic off for the first month.

When is the best time to lay sod?

Early fall for cool-season grasses, late spring for warm-season. Avoid peak summer heat — sod dries faster than you can water it.

Why are there gaps between my sod pieces?

Sod shrinks as it dries. Butt pieces tight at install and water immediately — gaps wider than a finger rarely close on their own.

How do I handle slopes?

Lay across the slope (not down it) and stake pieces on steep grades. Water gently — runoff carves channels under fresh sod.

Sod vs seed — which is better?

Sod gives an instant lawn at ~10× the cost of seed. Seed is cheaper and roots deeper, but takes 2–3 months and needs constant moisture. Sod wins when you need it now.

How do I measure a curved lawn?

Break it into rectangles, triangles, and circles; add the areas. Or pace it off in a grid and count full vs partial squares. Round up — running short mid-job is worse than leftovers.